HS2 drop-session and a visit to M214 footbridge
I discovered that there was a HS2 drop-in session being held at St John the Baptist Church in Berkswell. As readers of my blog will know, I have been documenting HS2 around the area, focussing on 16 Acre Wood since 2021. Other…
I discovered that there was a HS2 drop-in session being held at St John the Baptist Church in Berkswell. As readers of my blog will know, I have been documenting HS2 around the area, focussing on 16 Acre Wood since 2021. Other areas where I have enjoyed taking pictures of HS2 include the approach to Curzon Street, especially as it crosses the canal. In fact, I have several projects on HS2 in my files going back to 2013.

I was keen to learn about the HS2 viewpoint, having heard so much noise about the detrimental effects of the project on the environment. I did not know what to expect, but after a few friendly greetings, I got into discussion with the team. The display was detailed and covered the local activity. I was mesmerised by the drone footage being shown that was taken along the path of the line. The video gave me a real sense of the sheer scale of the project. My photo blog had focussed on 16 Acre Wood, so I was able to discuss in detail what was happening around that area. I wanted to learn more about the environmental aspect, and I was able to engage with people about what was planned around the route. Some questions I already knew the answers to, but I was interested in how they would reply.

I discussed in detail about the new pond that has been created and how HS2 is reacting to environmental concerns. I do find maps surrounding HS2 difficult to visualise as it took me a while to point out the area that I was focussing on. The example map does show the HS2 line, but my normal walk is not shown. However, the M214 footpath bridge looked interesting, and I did ask whether there would be a footbridge further up after 16 Acre Wood. I expect this will be either M215 or M216. I look forward to seeing these being completed. I picked up the HS2 newsletter and leaflets to read later.

As I had learnt the names of the bridges, I went for a short walk to see M214 for myself. The steel bridge is in place and the footpath should be operational not too far in the future. I also took the opportunity to view the line from the top of the embankment. There is so much change taking place along the path of HS2, even though completion is not expected until 2030 or later.

My walk back to Berkswell gave me the chance to take a few photographs, including the Boardwalk. The day was dull, but the unspoilt beauty of the area still came through. As for HS2, I came away with a positive view. I remain concerned about the damage caused by construction, but I was reassured that the project is environmentally aware. I look forward to seeing it reach completion and how the environment around HS2 recovers after all the construction.

I have several write-ups about HS2 and you may wish to view my blog entry on Starcross Yard an escape from Euston (2025) or read about HS2 gathers pace at Curzon street (2024).